Panama Project Reports
This page contains documents submitted to EWB-USA regarding the Sieykin, Panama Clean Water and Health Project. All documents contain background and summary information about the project, community, and past trips. For more detailed information regarding what was planned or occurred during a specific trip, please review the corresponding document. Documents are listed in chronological order, with the most recent at the top of the list…
512-One-Page Project Summary: This is a one page summary of the project.
521-Pre-Assessment V: This report contains information regarding the January 2013 Assessment Trip.
526-Post-Implementation II: This report contains information regarding the Phase II Implementation Trip the team took in July 2011.
HASP Implementation II: This is the Health and Safety Plan for the July 2011 Implementation trip.
525 – Pre-Implementation II: This document contains 95% design information for Seiykin Arriba, the second phase of implementation. (Document to be uploaded soon.)
524 – Preliminary Design Implementation II: This is the 30% design document for the July 2011 Implementation trip focusing on Seiykin Arriba.
523 – Alternatives Analysis Implementation II: This document contains information for the alternatives considered for Sieykin Arriba.
525-Pre-Implementation I Report 2010: This document contains 95% design information for El Centro, the first phase of implementation.
Documents for past trips can be found on our google site: https://sites.google.com/site/ewbauspanama/library/ewb-documents.